Results from city boards on road construction, townhome parking lot project
Here are the developments before the various City of Charleston boards and committees this week, as well as results, if any, from the prior week’s items specific to Daniel Island and the Cainhoy area.
More detailed agendas and results can be found at charleston-sc.gov/agendacenter.
RESULTS: BOARD OF ZONING APPEALS - ZONING
Oct. 7: 0 Pineneedle Way - Cainhoy - Request variance from Sec. 54-824 to allow lot frontage for the subdivision of the property into two single-family residential lots to be less than required (271’ and 291’ proposed, 362’ per lot required). TMS# 26300-04-035. Owner/Applicant: DJP Homes, LLC. Results: Denied.
RESULTS: TECHNICAL REVIEW COMMITTEE
Oct. 9: Cainhoy First Light Phase 3 - Road construction project. Proposed revisions to a previously approved TRC at 1625 Clements Ferry Road, Cainhoy. (76 single-family units on 58.1 acres). TMS: B2620000008. Owner: Cainhoy Land & Timber LLC. Applicant: Thomas & Hutton Engineering. Contact: Steven Roach, roach.s@tandh.com. Results: No Return/ Paperwork Comments.
Oct. 9: Fenland Expansion – Proposed redevelopment of existing parking lot for 24-unit townhome development at 1990 Daniel Island Drive, Daniel Island. TMS: B2750000185. Owner: HP 20000DI LLC. Applicant: LJA Engineering. Contact: Megan Smith, mesmith@lja.com. Results:
